North Green Point Screen Installation

Return to Completed Projects page

FID crews replaced the North Green Point diversion screen with an FCA Farmers Screen similar to the Davenport Screen on Farmers Canal but at a much smaller scale. The North Green Point Screen Installation was completed in September 2006.

  • Old-wood intake flume
  • Old cedar tree
  • Sandbags to protect stream and fish during construction
  • Relocating fish to protect them from construction work
  • Fish removal
  • Old flume removal
  • Commute
  • Excavation new screen
  • New screen
  • New steel flume
  • Before image old intakes
  • Connect pipeline
  • Finished bypass channel
  • Finished intake
  • Seeding tree planting 10-23-06